Our process
-
Prepare quote upon receiving architects drawings and discuss specific requirements
-
Receipt of completed architects drawings
Lansdowne Green receive signed order and deposit to cover prelim design and engineering
-
Design review
Preparation of loads, as well as load bearing walls
Preparation of plans, section & elevations
-
Client comments
Amend as required
Client approval
Confirm delivery date
Client prepares site ready for Lansdowne Green’s arrival
-
Finalise engineering
Finalise design for manufacture
Pass to Factory for manufacture and kit preparation
-
Firm up delivery date
Cut and manufacture panels
Make up kits
Prepare for delivery
-
Check site dimensions for accuracy
RAMS
Erection
Sign off
Completion certificates
Liaise with other contractors as required
What we use
KVH
Glue Laminated Timber
Finnjoist
Posi Joist
Timber Framing
Cross-laminated Timber
Timber Framing
TEK